Recherchebereich

Symbol Version, Sprache

Ergebnisbereich

Suchanfrage: Es wurde noch keine Recherche ausgeführt.

Symbol IPC-Stellen auswählen Titel
A
Hierarchie anzeigen
HUMAN NECESSITIES
B
Hierarchie anzeigen
PERFORMING OPERATIONS; TRANSPORTING
C
Hierarchie anzeigen
CHEMISTRY; METALLURGY
D
Hierarchie anzeigen
TEXTILES; PAPER
E
Hierarchie anzeigen
FIXED CONSTRUCTIONS
E01
Hierarchie anzeigen
BUILDING
E01
Hierarchie anzeigen
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES (of tunnels E21D)
E02
Hierarchie anzeigen
HYDRAULIC ENGINEERINGFOUNDATIONSSOIL-SHIFTING
E02B
Hierarchie anzeigen
HYDRAULIC ENGINEERING (ship-lifting E02C; dredging E02F)
E02C
Hierarchie anzeigen
SHIP-LIFTING DEVICES OR MECHANISMS
E02D
Hierarchie anzeigen
FOUNDATIONSEXCAVATIONSEMBANKMENTS (specially adapted for hydraulic engineering E02B)UNDERGROUND OR UNDERWATER STRUCTURES [6]
E02D 1/00
Hierarchie anzeigen
Investigation of foundation soil in situ (investigation involving boring or specially adapted to earth drilling E21B 25/00 , E21B 49/00; investigating or analysing materials by determining their chemical or physical properties, in general G01N , e.g. sampling G01N 1/00)
E02D 3/00
Hierarchie anzeigen
Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/20; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00 , E01C 23/10; setting rock anchoring bolts E21D)
E02D 5/00
Hierarchie anzeigen
Bulkheads, piles, or other structural elements specially adapted to foundation engineering (engineering elements in general F16)
E02D 7/00
Hierarchie anzeigen
Methods or apparatus for placing sheet pile bulkheads, piles, mould-pipes, or other moulds (for both placing and removing E02D 11/00)
E02D 9/00
Hierarchie anzeigen
Removing sheet pile bulkheads, piles, mould-pipes, or other moulds (for both placing and removing E02D 11/00)
E02D 11/00
Hierarchie anzeigen
Methods or apparatus for both placing and removing sheet pile bulkheads, piles, or mould-pipes (features relating to placing only E02D 7/00 , to removing only E02D 9/00)
E02D 13/00
Hierarchie anzeigen
Accessories for placing or removing piles or bulkheads
E02D 15/00
Hierarchie anzeigen
Handling building or like materials for hydraulic engineering or foundations (conveying or working-up concrete or similar masses in general E04G 21/02)
E02D 17/00
Hierarchie anzeigen
ExcavationsBordering of excavationsMaking embankments (soil shifting apparatus E02F; earth drilling E21)
E02D 19/00
Hierarchie anzeigen
Keeping dry foundation sites or other areas in the ground (sheet piles or bulkheads E02D 5/02)
E02D 23/00
Hierarchie anzeigen
CaissonsConstruction or placing of caissons (tunnels submerged into or built in open water E02D 29/063) [6]
E02D 25/00
Hierarchie anzeigen
Joining caissons or like sunk units to each other under water
E02D 27/00
Hierarchie anzeigen
Foundations as substructures
E02D 27/01
Hierarchie anzeigen
Flat foundations
E02D 27/02
Hierarchie anzeigen
. . Flat foundations without substantial excavation (E02D 27/04 , E02D 27/08 take precedence)
E02D 27/04
Hierarchie anzeigen
. . in water or on quicksand
E02D 27/06
Hierarchie anzeigen
. . . Floating caisson foundations
E02D 27/08
Hierarchie anzeigen
. . Reinforcements for flat foundations
E02D 27/10
Hierarchie anzeigen
Deep foundations
E02D 27/12
Hierarchie anzeigen
. . Pile foundations
E02D 27/14
Hierarchie anzeigen
. . . Pile framings
E02D 27/16
Hierarchie anzeigen
. . . Foundations formed of separate piles
E02D 27/18
Hierarchie anzeigen
. . Foundations formed by making use of caissons
E02D 27/20
Hierarchie anzeigen
. . Caisson foundations combined with pile foundations
E02D 27/22
Hierarchie anzeigen
. . Caisson foundations made by starting from fixed or floating artificial islands by using protective bulkheads
E02D 27/24
Hierarchie anzeigen
Foundations constructed by making use of diving-bells (equipment for dwelling or working under water B63C 11/00)
E02D 27/26
Hierarchie anzeigen
Compacting soil locally before forming foundationsConstruction of foundation structures by forcing binding substances into gravel fillings (consolidating foundation soil in general E02D 3/02 to E02D 3/12)
E02D 27/28
Hierarchie anzeigen
Stressing the soil or the foundation structure while forming foundations
E02D 27/30
Hierarchie anzeigen
Foundations made with permanent use of sheet pile bulkheads, walls of planks, or sheet piling boxes
E02D 27/32
Hierarchie anzeigen
Foundations for special purposes
E02D 27/34
Hierarchie anzeigen
. . Foundations for sinking or earthquake territories (building constructions with protection arrangements against earthquakes E04H 9/02)
E02D 27/35
Hierarchie anzeigen
. . Foundations formed in frozen ground, e.g. in permafrost soil [3]
E02D 27/36
Hierarchie anzeigen
. . Foundations formed in moors or bogs
E02D 27/38
Hierarchie anzeigen
. . Foundations for large tanks, e.g. oil tanks
E02D 27/40
Hierarchie anzeigen
. . Foundations for dams across valleys or for dam constructions
E02D 27/42
Hierarchie anzeigen
. . Foundations for poles, masts, or chimneys
E02D 27/44
Hierarchie anzeigen
. . Foundations for machines, engines, or ordnance (special layout of foundations with respect to machinery to be supported F16M 9/00)
E02D 27/46
Hierarchie anzeigen
. . Foundations for supply conduits or other canals
E02D 27/48
Hierarchie anzeigen
. . Foundations inserted underneath existing buildings or constructions
E02D 27/50
Hierarchie anzeigen
. . Anchored foundations
E02D 27/52
Hierarchie anzeigen
. . Submerged foundations
E02D 29/00
Hierarchie anzeigen
Underground or underwater structures (underground tanks B65D 88/76; hydraulic engineering, e.g. sealings or joints, E02B; underground garages E04H 6/00; underground air-raid shelters E04H 9/12; burial vaults E04H 13/00)Retaining walls [6]
E02D 31/00
Hierarchie anzeigen
Protective arrangements for foundations or foundation structuresGround foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution (spillage retaining means for tanks B65D 90/24)
E02D 33/00
Hierarchie anzeigen
Testing foundations or foundation structures (testing methods or apparatus, see the relevant subclasses of class G01; testing structures or apparatus as regards function, in general, G01M; investigating or analysing materials by determining their chemical or physical properties, in general G01N)
E02D 35/00
Hierarchie anzeigen
Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations
E02D 37/00
Hierarchie anzeigen
Repair of damaged foundations or foundation structures
E02F
Hierarchie anzeigen
DREDGINGSOIL-SHIFTING (winning peat E21C 49/00)
E03
Hierarchie anzeigen
WATER SUPPLYSEWERAGE
E04
Hierarchie anzeigen
BUILDING (layered materials, layered products in general B32B)
E05
Hierarchie anzeigen
LOCKSKEYSWINDOW OR DOOR FITTINGSSAFES
E06
Hierarchie anzeigen
DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS, IN GENERALLADDERS
E21
Hierarchie anzeigen
EARTH OR ROCK DRILLING; MINING
E21
Hierarchie anzeigen
EARTH OR ROCK DRILLINGMINING
F
Hierarchie anzeigen
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
G
Hierarchie anzeigen
PHYSICS
H
Hierarchie anzeigen
ELECTRICITY

Zu vergleichende IPC-Stelle: Es wurden im Verzeichnis noch keine IPC-Stellen für die Vergleichsansicht vorgemerkt. [Version , Sprache ]