Recherchebereich

Symbol Version, Sprache

Ergebnisbereich

Suchanfrage: Es wurde noch keine Recherche ausgeführt.

Symbol IPC-Stellen auswählen Titel
A
Hierarchie anzeigen
HUMAN NECESSITIES
B
Hierarchie anzeigen
PERFORMING OPERATIONSTRANSPORTING
C
Hierarchie anzeigen
CHEMISTRYMETALLURGY
D
Hierarchie anzeigen
TEXTILESPAPER
E
Hierarchie anzeigen
FIXED CONSTRUCTIONS
E01
Hierarchie anzeigen
BUILDING
E01
Hierarchie anzeigen
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
E02
Hierarchie anzeigen
HYDRAULIC ENGINEERINGFOUNDATIONSSOIL-SHIFTING
E02B
Hierarchie anzeigen
HYDRAULIC ENGINEERING (ship-lifting E02C; dredging E02F)
E02C
Hierarchie anzeigen
SHIP-LIFTING DEVICES OR MECHANISMS
E02D
Hierarchie anzeigen
FOUNDATIONSEXCAVATIONSEMBANKMENTS (specially adapted for hydraulic engineering E02B)UNDERGROUND OR UNDERWATER STRUCTURES [6]
E02D 1/00
Hierarchie anzeigen
Investigation of foundation soil in situ (investigation involving boring or specially adapted to earth drilling E21B 25/00, E21B 49/00; investigating or analysing materials by determining their chemical or physical properties, in general G01N, e.g. sampling G01N 1/00) [1, 2006.01]
E02D 3/00
Hierarchie anzeigen
Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/20; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/10; setting rock anchoring bolts E21D) [1, 2006.01]
E02D 5/00
Hierarchie anzeigen
Bulkheads, piles, or other structural elements specially adapted to foundation engineering (engineering elements in general F16) [1, 2006.01]
E02D 7/00
Hierarchie anzeigen
Methods or apparatus for placing sheet pile bulkheads, piles, mould-pipes, or other moulds (for both placing and removing E02D 11/00) [1, 2006.01]
E02D 9/00
Hierarchie anzeigen
Removing sheet pile bulkheads, piles, mould-pipes, or other moulds (for both placing and removing E02D 11/00) [1, 2006.01]
E02D 11/00
Hierarchie anzeigen
Methods or apparatus for both placing and removing sheet pile bulkheads, piles, or mould-pipes (features relating to placing only E02D 7/00, to removing only E02D 9/00) [1, 2006.01]
E02D 13/00
Hierarchie anzeigen
Accessories for placing or removing piles or bulkheads [1, 2006.01]
E02D 15/00
Hierarchie anzeigen
Handling building or like materials for hydraulic engineering or foundations (conveying or working-up concrete or similar masses in general E04G 21/02) [1, 2006.01]
E02D 17/00
Hierarchie anzeigen
ExcavationsBordering of excavationsMaking embankments (soil shifting apparatus E02F; earth drilling E21) [1, 2006.01]
E02D 17/02
Hierarchie anzeigen
Foundation pits [1, 2006.01]
E02D 17/04
Hierarchie anzeigen
. . Bordering or stiffening the sides of foundation pits [1, 2006.01]
E02D 17/06
Hierarchie anzeigen
Foundation ditches or narrow shafts [1, 2006.01]
E02D 17/08
Hierarchie anzeigen
. . Bordering or stiffening the sides of ditches or narrow shafts for foundations [1, 2006.01]
E02D 17/10
Hierarchie anzeigen
. . Covering trenches for foundations [1, 2006.01]
E02D 17/12
Hierarchie anzeigen
. . Back-filling of foundation trenches or ditches [1, 2006.01]
E02D 17/13
Hierarchie anzeigen
Foundation slotsImplements for making these slots [1, 2006.01]
E02D 17/16
Hierarchie anzeigen
Loosening of soil or rock, under water (for correcting streams E02B 3/02; by dredgers or excavators E02F) [1, 2006.01]
E02D 17/18
Hierarchie anzeigen
Making embankments (E02D 17/20 takes precedence) [1, 2006.01]
E02D 17/20
Hierarchie anzeigen
Securing of slopes or inclines [1, 2006.01]
E02D 19/00
Hierarchie anzeigen
Keeping dry foundation sites or other areas in the ground (sheet piles or bulkheads E02D 5/02) [1, 2006.01]
E02D 23/00
Hierarchie anzeigen
CaissonsConstruction or placing of caissons (tunnels submerged into or built in open water E02D 29/063) [1, 6, 2006.01]
E02D 25/00
Hierarchie anzeigen
Joining caissons or like sunk units to each other under water [1, 2006.01]
E02D 27/00
Hierarchie anzeigen
Foundations as substructures [1, 2006.01]
E02D 29/00
Hierarchie anzeigen
Underground or underwater structures (underground tanks B65D 88/76; hydraulic engineering, e.g. sealings or joints, E02B; underground garages E04H 6/00; underground air-raid shelters E04H 9/12; burial vaults E04H 13/00)Retaining walls [1, 6, 2006.01]
E02D 31/00
Hierarchie anzeigen
Protective arrangements for foundations or foundation structuresGround foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution (spillage retaining means for tanks B65D 90/24) [1, 2006.01]
E02D 33/00
Hierarchie anzeigen
Testing foundations or foundation structures (testing methods or apparatus, see the relevant subclasses of class G01; testing structures or apparatus as regards function, in general, G01M; investigating or analysing materials by determining their chemical or physical properties, in general G01N) [1, 2006.01]
E02D 35/00
Hierarchie anzeigen
Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations [1, 2006.01]
E02D 37/00
Hierarchie anzeigen
Repair of damaged foundations or foundation structures [1, 2006.01]
E02F
Hierarchie anzeigen
DREDGINGSOIL-SHIFTING (winning peat E21C 49/00)
E03
Hierarchie anzeigen
WATER SUPPLYSEWERAGE
E04
Hierarchie anzeigen
BUILDING
E05
Hierarchie anzeigen
LOCKSKEYSWINDOW OR DOOR FITTINGSSAFES
E06
Hierarchie anzeigen
DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS, IN GENERALLADDERS
E21
Hierarchie anzeigen
EARTH OR ROCK DRILLINGMINING
E21
Hierarchie anzeigen
EARTH OR ROCK DRILLINGMINING
E99
Hierarchie anzeigen
SUBJECT MATTER NOT OTHERWISE PROVIDED FOR IN THIS SECTION [2006.01]
F
Hierarchie anzeigen
MECHANICAL ENGINEERINGLIGHTINGHEATINGWEAPONSBLASTING
G
Hierarchie anzeigen
PHYSICS
H
Hierarchie anzeigen
ELECTRICITY

Zu vergleichende IPC-Stelle: Es wurden im Verzeichnis noch keine IPC-Stellen für die Vergleichsansicht vorgemerkt. [Version , Sprache ]